-
Philip Hofzmann-Sembcorp JV
- Deep Tunnel Sewerage System Contract
- T-05 Kranji
-
Punj Lloyd Singapore Pte. Ltd.
- BLPT- Horizon Project
- BLPT – Helios Project
- Exxon Mobil ( SPT/SAR R/IC&T Tankage)
- JSS Project
- Shaw / Stone & Webster SPT Ole Rec
- Tuas Fabrication
- SAR-R
- IC&T Tankage
- MP.04
- JAC Project
-
Singapore Piling & Civil Engineering Pte. Ltd.
- Changi Airport N2 Project
- CIBA Project – Jurong Island
-
Sin Ek Engineering Pte Ltd
- D7605 Nestle – Shutdown and Maintenance Works
- SHL4MQ0091C – Shutdown and Maintenance Works
- S7605 Nestle – Shutdown and Maintenance Works
- T7605 Nestle – Shutdown and Maintenance Works
-
Sitra Holdings International Limited
-
Sambo Geo-Tosfoc Co. Ltd.
- PSA IB Pasir Panjang
- LTA North East Line MRT N706
- Changi Airport Line C504 Project
- JTC PDL Berths J24 & J25 Project
- Changi Water Reclamation Project
- Jurong Sewerage Treatment Work
- Changi Water Reclamation C2A Phase 3
- Kallang Paya Lebar Expressway C423
- Circle Line Stage 2 – Contract 822
- Stamford Road Museum Extension
- Marina Bay Sands Integrated Resort Project
-
Sambo E & C Co. Ltd.
- C483
- C920
- South Bridge Road
- C482
- C902
- C919 – DTL2
- DTL 921
- NsLe C156
-
Sambo E & C Pte. Ltd.
- Downtown Line C902 Project
- Downtown Line C901 Project
- MCE482 – Marina Coastal Expressway
-
Samsung C&T Corporation
- Church Street Office Building
- NSLe C156
-
Shanghai Tunnel Engineering Co. Ltd
- Bay Front
- T206 Thomson Line
- C920
- MBS 8402
-
Shanghai Geoharbour Construction Co. Ltd
- MOT Project
- Tuas South Boulevard Project
-
Sumitomo Construction Co. Ltd.
- Singapore Acetyls Project Pulau Sakra
- Seraya II Project
- De Lente Condominium at Holland Road
- Palm Haven Condominium
- MSD SPF at Tuas
- PB – 3 Expanasion for Glaxo Smithline
- Schering Plough Tableting Plant
- Pfizer Asia Pacific Bulk Chemical facility at Tuas
- Nissan Showroom @ UBI Road 4
- Glaxo-Smith Kline